SUBJECT: DEFINING A PROJECT
A project work request will be denied that is not properly plan and funded.
The only time we will do a non funded project work or those out of our scope of work is when there is a written approval from upper management.
Thank you
MEMORANDUM October 8, 2010
TO: Deans, Directors, Campus Community
VIA: Chief Plant and Facilities Officer, Vice President for Administration and Finance, President
FROM: Building Maintenance Superintendent
SUBJECT: Defining Projects
Purpose
It is highly recommended that defining a project is required for accurate reporting for resource usage of Plant\Maintenance. The benefits from project definition are; resource allocation, energy management, contractor control and preferred management practice.
As noted in our discussion with “Sodexo”, departments purchasing inefficient equipment, using sub standard vendors\contractors and not informing Plant\Maintenance clearly reinforce the need for defining Projects and creating an approval process for all of UOG departments.
Recommendations on the definition on what is a project:
Projects are defined as requested and assigned work involving the addition or a change to an existing building, system, room, and grounds at the University of Guam and its associated properties.
Action Requested
All projects must have approval of Plant\Maintenance. The process for approval is as follows:
1. Clearly define the work via the work request system. (Maintenance Connection)
2. Follow up with an email to Frank Troy identifying the work order number and any additional information on your proposed project as required.
3. Identify a source of funding for this project.
( )APPROVAL ( )APPROVAL ( )APPROVAL
( ) DISAPPROVAL ( ) DISAPPROVAL ( ) DISAPPROVAL
_________________________ _________________________ ____________________
Sonny P. Perez David M. O’Brien Robert A. Underwood
Chief Plant Facilities Officer Vice President of Admin & Finance UOG President
STANDARD OPERATING PROCEDURES (SOP)
For University of Guam Plant Maintenance Division
STANDARD OPERATING PROCEDURES (SOP)
For University of Guam Plant Maintenance Division
INTRODUCTION:
To establish an effective, efficient and workable general Standard Operating Procedure (SOP) that is reasonably achievable and prioritize each Maintenance Work Order Request (MWOR) that is acceptable with limited resources available by both the UOG requester and the maintenance department.
Responsibilities
1. The Plant Maintenance Division: Is established directly under the Vice President of Administration and Finance (VPAF) who has overall command responsibility for maintenance operations.
2. The Chief Plant and Facilities Officer (CPFO): Is responsible directly to the Vice President of Administration and Finance overall operation and function of the maintenance section and will continuously advise and keep the VPAF informed on the status of all maintenance operations. The CPFO will ensure that maintenance operations are in accordance with all existing regulations and directives. Additionally, the CPFO will:
3. The Building Maintenance Superintendent (BMS): Is responsible directly to the Chief Plant and Facilities Officer overall operation and function of the maintenance section and will continuously advise and keep the CPFO informed on the status of all maintenance operations. The BMS will ensure that maintenance operations are in accordance with all existing regulations and directives. Additionally, the BMS will:
Responsible for facilities and plant operations, maintenance and security such that physical resources and operations are effectively aligned with institutional purposes and educational objectives, and are sufficiently developed to support and maintains the level and kind of educational programs offered. I assist the CPFO in operating and maintaining over $100 million of physical assets (replacement value) within a budget of over $4.3 million. The position manages approximately 40 staff. Direct reports will include building and plant maintenance supervisors, a buyer and an outsourced security function. Major duties and responsibilities include, but not limited to the following:
• manage campus plant and facility operations to effectively deliver building maintenance, custodial, grounds, carpentry, HVAC, electrical, plumbing and mechanical services that support the University’s academic, research and service needs
• interact with academic deans and directors to understand the academic needs for plant and facilities and to identify related operational priorities, service/ performance/ accreditation standards, workmanship, cost and quality expectations
• direct the operation of the physical plant in compliance with applicable building, fire and life safety, ADA, occupational health codes, regulations, and standards
• administer the outsourced security contract and work closely with the University’s safety inspectors to provide secure, safe and healthy learning and work environments
• ensure that work orders are processed and completed in a timely, cost-effective manner
• administer University-wide energy conservation programs
• develop and manage the implementation of continuous improvement plans
• manage the purchasing of parts, equipment and services and assist in the development of RFPs and bids
• plan, assign, supervise, coordinate, inspect and evaluate the work of subordinates in accordance with University needs and administrative and personnel polices
• serve as the University’s representative and advocate to the Gov Guam homeland security and Recovery Activity Coordinator reporting to Civil Defense
• deliver the University’s emergency response plan, when required, in concert with other government agencies
• provide on-site (including after normal working hours) management for plant and facilities in urgent situations/ emergencies (e.g., fire, flood, electrical, sewer) and severe weather (e.g., typhoons, earthquakes)
• operate and maintain all buildings and grounds for health, safety and beautification
• interact with external groups (i.e., union) in employment matters, as appropriate
• work as a team with the Coordinator, Campus Construction Projects in meeting campus infrastructure needs
• maintain records and prepare management reports related to assigned duties and responsibilities
• web master for the Administration and Finance department with administering a successful conversion to a computerized work order system
• perform other duties as assigned.
4. The Electrical Supervisors: Is responsible directly to the Building Maintenance Superintendentoverall operation and function of the maintenance section and will continuously advise and keep the BMS informed on the status of all maintenance operations. The Supervisors will ensure that maintenance operations are in accordance with all existing regulations and directives. Additionally, the Electrical Supervisors will:
· Plans, supervises and participates in the installation, alteration, maintenance and repair of electrical mechanical systems, appliances and devices.
· Supervises and participates in the installation, alteration, maintenance and repair of electrical systems, appliances and devices.
· Establishes work schedules and practices; makes decisions regarding need for and extent of repairs to be made to systems and equipment.
· Makes time/material estimates; reviews work in progress and inspects completed jobs.
· Makes periodic inspection of electrical/mechanical systems, appliances and devices to determine adequacy of existing systems, repairs or replacements.
· Establishes, supervises & verifies records of repairs and operating expenses; inventory and replacement orders; and prepares/submits related reports.
· Keeps current with electrical/mechanical systems & equipment repair manuals, directives, warranties and manufacturer's instruction materials pertaining to the trade.
· Enforces agency policies for personnel, training and safety; recognizes & rectifies unsafe conditions; and plans work in accordance with accepted and recognized safety procedures and practices.
· Meets & confers with officials/contractors regarding electrical/mechanical equipment and maintenance programs, plans or problems.
· Performs related duties as required.
5.The Air Conditioning & Refrigeration Mechanic Leader: Is responsible directly to the Building Maintenance Superintendentoverall operation and function of the maintenance section and will continuously advise and keep the BMS informed on the status of all maintenance operations. The Supervisors will ensure that maintenance operations are in accordance with all existing regulations and directives. Additionally, theAir Conditioning & Refrigeration Mechanic Leader will:
· Leads a crew and performs skilled work in the installation, maintenance and repair of air conditioning/refrigeration equipment.
· Leads the work of a A/C & refrigeration mechanic crew; passes on to lower level mechanics the instructions received from the supervisor and completes work assignments; demonstrates proper work methods and procedures and proper use of tools and equipment.Maintains records such as individual work time; and equipment data records from thermostats and gauges; furnishes information regarding such matters as progress, production, personnel injury and costs; assures that materials, tools and equipment are available.
· Performs skilled tasks; reads A/C & refrigeration blueprints, diagrams and sketches and works directly from them; maintains current knowledge and answers questions of other workers on procedures and instructions; inspects work while in progress and upon completion to verify that supervisor's instructions on work sequence, procedures, methods, and deadlines have been met; ensures that safety and housekeeping rules are followed.
· Performs related work as required
6. The Building Maintenance Supervisors (Buildings): Is responsible directly to the Building Maintenance Superintendentoverall operation and function of the maintenance section and will continuously advise and keep the BMS informed on the status of all maintenance operations. The Supervisors will ensure that maintenance operations are in accordance with all existing regulations and directives. Additionally, the Building Maintenance Supervisors (Buildings) will:
· Supervises and participates in skilled carpentry, plumbing and electrical work involved in the maintenance, alteration and repair of buildings.
· Supervises and participates in carpentry work involved in the maintenance, alteration and repair of buildings and installation, alteration, maintenance and repair of plumbing and electrical system, appliances, fixtures and related devices.
· Establishes work schedules and practices; makes decisions regarding need for & extent of repairs to be made.
· Directs the storage and maintenance of carpentry, plumbing and electrical supplies and equipment (non custodial/grounds) and ensures they are maintained and available for work projects; orders supplies, tools and equipment as needed.
· Estimates the time and material costs for work projects.
· Interprets and works directly from blueprints, sketches and diagrams.
· Confers with administrators on building maintenance problems and programs.
· Applies and enforces safe work practices on the job.
· Maintains records and prepares reports.
· Implements agency policies for personnel, training and safety of subordinates.
7. The Building Maintenance Supervisors (Custodial/Grounds): Is responsible directly to the Building Maintenance Superintendentoverall operation and function of the maintenance section and will continuously advise and keep the BMS informed on the status of all maintenance operations. The Supervisors will ensure that maintenance operations are in accordance with all existing regulations and directives. Additionally, the Building Maintenance Supervisors (Custodial/Grounds) will:
· Supervises and participates in maintaining the routine custodial services and related minor repair of buildings; in maintaining the routine grounds services for the university campus.
· Supervises and participates in the maintenance, minor alteration and minor repair of buildings; and maintenance of the campus grounds and coordinating necessary repairs/maintenance of custodial/grounds equipment .
· Establishes work schedules and practices; makes decisions regarding need for & extent of repairs to be made.
· Directs the storage and maintenance of custodial/grounds supplies and equipment and ensures they are maintained and available for work projects; orders supplies, tools and equipment as needed.
· Estimates the time and material costs for work projects.
· Interprets and works directly from work orders.
· Confers with administrators on custodial, and grounds related problems and programs.
· Applies and enforces safe work practices on the job.
· Maintains records and prepares reports.
· Implements agency policies for personnel, training and safety of subordinates.
· Performs related duties as required.
8. The Employee: Is responsible directly to the Supervisor overall operation and function of the maintenance section and will continuously advise and keep the Supervisor informed on the status of all maintenance operations. The Supervisors will ensure that maintenance operations are in accordance with all existing regulations and directives. Additionally, the Employee will:
9. The Requestor: Is responsible directly to the Supervisor overall operation and function of the maintenance section and will continuously advise and keep the Supervisor informed on the status of all maintenance operations. The Supervisors will ensure that maintenance operations are in accordance with all existing regulations and directives. Additionally, the Employee will:
OPERATIONS
1. Online Maintenance Work Order Request (MWOR) System
Purpose
To provide a maintenance process from requestor to completion and close out by the numbers as part of improving the maintenance management process.
Maintenance Process
1. Authorized requestor prepares maintenance work order request (MWOR).
2. Logged into the automated computer helpdesk system and sent out.
3. Request is received by the Building Maintenance Superintendent.
4. BMS reviews and determines what category the request would fall under, see list of categories below
- If it is determine to be an IMMEDIATE it is immediately assign and acted on without delay.
- If it is determine to be a HIGH priority it is assign and acted on within a 24 hour period.
- If it is determine to be a MED priority it is assign and acted on within a 48 hour period.
- If it is determine to be a LOW priority it is assign and scheduled based on/or a combination of the following:
a. Materials needed or ordering of materials
b. Labor extensive interfering with academic instructions
c. Lack of/or identifying funding to support the request
d. Minimal resources that requires outsourcing
e. Typhoon related damages awaiting FEMA funding
f. Extremely extensive characterizing it as a Capital Outlay Plan or Deferred Maintenance Plan
5. BMS assign a work order number to the request and sends it out to the appropriate supervisor.
6. Supervisors communicates with the requestor and act on Emergency, High, and Med priority in that order.]
7. For Low priority there is a series of steps that needs to takes place:
a. Supervisor communicates with the requestor to clarify the request.
b. Supervisor puts together a plan and material listing due to the absence of a maintenance planner/estimator.
c. Supervisor reports back to the BMS with his findings and to receive additional instructions and / or approval/disapproval to continue.
d. If approved the material listing is then given over to the supply office for processing.
8. Projects are defined as requested and assigned work involving the addition or a change to an existing building, system, room, and grounds at the University of Guam and its associated properties.
Action Requested
All projects must have approval of Plant Management. The process for approval is as follows:
1. Clearly define the work via the work request system. (Maintenance Connection)
2. Follow up with an email to Frank Troy identifying the work order number and any additional information on your proposed project as required.
3. Identify a source of funding for this project.
UNIVERSITYOF GUAM
UNIBETSEDÅTGUAHAN
MAINTENANCE WORK REQUEST
PLANT MAINTENANCE DIVISION
U.O.G. Station, Mangilao, Guam 96913
Phone: 735-2385/76 Fax: 734-8918 E-Mail: ftroy@guam.uog.edu
EMERGENCY MAINTENANCE REQUEST PROCEDURE
(KEEP NEAR THE PHONE)
IN AN EMERGENCY, CALL THE ABOVE CONTACT NUMBERS AND GIVE THEINFORMATION IN THE SEQUENCE SHOWN BELOW.
1. Caller name and phone number. Is safety involved?
Mary M. Perez, 735-2332 No
2. Department where work is needed.
Learning Resources, RFK Library
3. Machine or equipment type and location.
Door Knob of Conference Room #2, 2nd floor.
4. Describe the problem and what may be causing it.
Can’t open conference room because of a broken key in the keyhole.
5. Describe work requested and priority.
Please disengage broken key --- Needed
6. When can the work be done?
[ ]Now [X]Later, Time [ ]Other: Explain (i.e. during semester break.)
7. When must the work be completed?
At your earliest possible; students, on a daily basis, use conference room. This will hamper its availability until fixed.
8. What maintenance craft is needed? ?
□ Electrical □ PM □ AC □ Other
9. How did the problem happen?
When trying to unlock the conference room the key broke in half. The broken half is submerged in the keyhole.
10. If minor, have you tried to fix it? What happened? N/A
Note: An emergency is a situation in which an unscheduled shutdown of needed equipment has occurred or is imminent due to danger of injury to personnel, critical loss or possibility of canceling classes.
2. Preventive Maintenance Checks & Service (PMCS)
The frequency for the maintaining of AC systems and their associated equipment/components should be done in accordance with manufacturer specifications or as prescribed below: A standard log book should be initiated in order to provide technicians with historical of any AC system or unit being serviced and maintained.
Pedro Benito
SOP / Daily Routine
Check every morning the following Buildings.
1. Science / planetarium main a/c unit. 2. Health science. 3. Class
4. EC 5. Lecture hall 6. CNAS
7. Computer ctr. 8. RFK 9. SOE
10. L.G. bldg 11. MARC / PDLC
Check main a/c units for proper operation.
Check for open trouble calls and assign a/c crew to respond as per priority.
Schedule projects and installations with customers.
Fill – out material request forms and obtain price quotations for parts and materials.
Input data, assign, and close work request on maintenance connection on a daily basis.
Provide a/c crew with parts, materials, equipment to complete task assigned.
Provide proper Personal Protective Equipment (PPE) for a/c crew to accomplish job safely.
Coordinate with contractors as per scope of work.
Assure and inspect work of contractors as to complete work on a timely manner and to follow scope of work.
Assure employees accomplish mission of UOG and to provide a safe working environment.
Basic Maintenance Check List:
Å Inlet Filter Cartridges: Inspect and clean or replace per manufacturer specifications. Required frequency is often related to operating conditions. Dirty filters increase energy consumption. (Bi-weekly)
Å Drain Traps: Clean out debris and check operation periodically. (Weekly)
Å Compressor Lubricant Level: Inspect daily and top off or replace per manufacturer specifications. Change lubricant filter per manufacturer specifications. (Monthly)
Å Air Lubricant Separator (Lubricant –inject Rotary Screw Compressors): Change per manufacturer specifications, or when pressure drop exceeds 10 psid, which ever is less. (Monthly)
Å Lubricant Selection: Select compressor and electric motor lubricant per manufacturer specifications. (Prior to replacement)
Å Belt Condition: Check belts for wear and check/adjust tension per manufacturer specifications. (Monthly)
Å Operating Temperature: Verify that operating temperature is per manufacturer specification. (Weekly)
Å Air Line Filters: Replace particulate and lubricant removal elements when pressure drop exceeds 2 to 3 psid. Inspect all elements at least annually regardless of pressure drop indication. (As needed)
Å Water Cooling System: For water-cooled systems, check water quality (especially pH and total dissolved solids), flow, and temperature and clean/replace filters and heat exchangers per manufacturer specifications.
Å System Leaks: Check lines (especially joints), fittings, clamps, valves, hoses, disconnects, regulators, filters, lubricators, gauge connections, and end-use equipment for leaks. (Monthly)
Å System Cleanliness: Check system for compressor and motor lubricant leaks and cleanliness. (Monthly)
ACCU and condensing coils will be cleaned monthly. Unit will be taken off line and the following method be utilized to clean the coils. Use a pressurized water system or high pressure hose of some sort (at least 30psi) to shoot a spray of water through the coils in order to remove any build up of debris and other components detrimental to the health of the unit. Coils should be clean enough to see through them or water should be able to penetrate without any restrictions.
For the School of Business (LG Building)
AHU –
Important notes:
- All original condensing unit motors and fan bearings:
“REQUIRE NO LUBRICATION”
- Condenser coils: “MUST BE KEPT CLEAN”. Before attempting to clean coils ensure that electrical power is shut off. “DO NOT BEND OR DAMAGE FINS”
- “AIR HANDLER – FILTER INFORMATION” - Filters should be checked every 30 days and replaced or cleaned as necessary.
- AIR HANDLER – BLOWER INFORMATION: Blower wheels must be clean in order to ensure optimum operation. To inspect and clean the blower wheel, ensure that all power is shut off to the unit. Clean the assembly, check the bearings for looseness, rotate blower wheel while listening close to each bearing and with a finger on the bearing to check for noise or roughness in the bearing which will indicate a failing bearing.
- OBSTRUCTION TO AIR FLOW: Supply and return grills must be kept clear so air can be freely drawn into and discharged from the system.
Monthly:
Æ Lubricate bearings if operating continuously at 1500 rpm, or higher, or in other extreme conditions.
Æ Check cleanliness of filters, and replace is necessary.
Æ Check cooling coil drain pan to assure proper drainage.
Æ Inspect evaporator, and condensing coils. Clean if dirty, or obstructed in any way.
Quarterly:
Ä Lubricate bearings if operating at 1000 rpm, or less, and in temperatures less than 150o F, or other extreme conditions.
Ä Check damper operation for freedom of movement. Correct any binding that may occur. Check belts, and pulleys on all fan drives for tension, and unusual wear. (Note: Ensure that all belts are properly aligned. Refer to manufacturers specifications for correct alignment procedures.)
Ä Check of cooling section.
Ä Check inlet, and outlet air temperatures. Determine cause for abnormal changes.
Annually:
v Clean the condenser, and evaporator coils with steam, or a non-corrosive coil cleaner.
v Clean the drain line, “P” trap, and condensate pan.
v Check refrigerant pressures and temperatures and correct unusual operation.
v Check all electrical connections for tightness. Replace any suspect wires that show signs of deterioration. Ensure that all electrical wires and systems are operationally sound.
(a) Maintenance Personnel Operation: (Daily)
(b) Organization Operation: (Scheduled Service)
(c) Command Operation: (Deferred Maintenance)
3. Repair Parts
Requiring for tools are conducted through a procedure in place and Jerry Guerrero maintains the records of all those who have signed out tools / equipment. The supervisors are also responsible to ensure that their personnel are equipped with the proper tools to conduct their assigned task @ hand. Every year prior to the new FY budget the supervisors are ask to conduct an inventory of the tools / equipment for serviceability and submit a request to me for approval to replace due to fair wear and tear or a need for a certain tool / equipment.
4. Tools Operation
Requiring for tools are conducted through a procedure in place and Jerry Guerrero maintains the records of all those who have signed out tools / equipment. The supervisors are also responsible to ensure that their personnel are equipped with the proper tools to conduct their assigned task @ hand. Every year prior to the new FY budget the supervisors are ask to conduct an inventory of the tools / equipment for serviceability and submit a request to me for approval to replace due to fair wear and tear or a need for a certain tool / equipment.
For Personal Protective Equipment (PPE) it become the responsibility of the individual to ensure that they maintain at all time proper PPE for the require task at hand and must keep constant communication with their immediate supervisor and the Supply office.
5. Key Control
Requiring for tools are conducted through a procedure in place and Jerry Guerrero maintains the records of all those who have signed out tools / equipment. The supervisors are also responsible to ensure that their personnel are equipped with the proper tools to conduct their assigned task @ hand. Every year prior to the new FY budget the supervisors are ask to conduct an inventory of the tools / equipment for serviceability and submit a request to me for approval to replace due to fair wear and tear or a need for a certain tool / equipment.
6. Petroleum, Oil and Lubricate (POL)
Requiring for tools are conducted through a procedure in place and Jerry Guerrero maintains the records of all those who have signed out tools / equipment. The supervisors are also responsible to ensure that their personnel are equipped with the proper tools to conduct their assigned task @ hand. Every year prior to the new FY budget the supervisors are ask to conduct an inventory of the tools / equipment for serviceability and submit a request to me for approval to replace due to fair wear and tear or a need for a certain tool / equipment.
7. Awards Program
8. Cross Training, OJT, Apprenticeship Program
9. Fire Prevention
10. Reports
11. Calibration
12. Personnel Training
13. Natural Disasters Response Operation
PURPOSE and GUIDELINES: The purpose of these guidelines is to provide an organized procedure that deals with preparation for a typhoon. The Maintenance Division is, tasked with the responsibility of accomplishing this operation. The Division will be, divided into five (5) teams with team leader. Each team will be responsible for boarding up designated buildings. As each assigned building is, completed the team leader will radio or telephone base of the completion and the team leader will escort their team to the next available building requiring assistance or request for further instructions from base.
NOTIFICATION: Once the Building Maintenance Superintendent has been, notified of the weather conditions, a decision will be, announced to the division to prepare to secure the campus. If this announcement is during duty hours, the team leaders will assemble their crew as outlined in this Operational Instruction and begin securing the campus. In the event that they announcement it’s condition three (3) is made after, working hours and the campus has not yet been secured, the recall procedures will begin immediately by the Building Maintenance Superintendent notifying the Team Leaders, and they will begin calling their team members. All those individuals without telephones will be responsible for monitoring the weather report after hours and calling their Supervisors for update. The Building Maintenance Superintendent may recall any employee anytime prior to the announcement of the Condition II depending on the status of the storm and prevailing conditions.
REQUIRED EQUIPMENT: Each Team leader will have a radio or telephone to communicate with base and will insure that the team has all the proper equipment needed to complete its assigned task and request for instructions from the Building Maintenance Superintendent.
DISPATCH: Once the Building Maintenance Superintendent has announced that the campus must be secure, each Team Leader is to recognize their personnel and dispatch them to their assigned building for immediate securing. All personnel must report to their Team Leaders for instructions. The Team Leader will be responsible for turning in the name and time of all personnel members present as well as submitting any required reports.
Should the announcement of Typhoon Condition II occurs after hours each Team Leader will begin contacting each team member to report to the campus immediately and the Team Leaders must report to the Building Maintenance Superintendent by radio/telephone as soon as possible.
Once the campuses are secure, all Team Leaders and personnel will report to the Maintenance Office/Shop. The Building Maintenance Superintendent or a designated representative will release all assigned maintenance personnel once all the teams have reported in and the campus security for cross-checked.
***** Strict adherence to these procedures is expected. There will be no early releases without authorization from the Building Maintenance Superintendent. If the Team Leaders are unable to contact the Building Maintenance Superintendent, they are to seek additional instruction from a designated representative.
Typhoon and Earthquake Condition
(Typhoon and Earthquake Restoration & Damaged Assessment)
NOTIFICATION: Upon receiving notification, whether by Radio, Building Maintenance Superintendent, Team Leader all team members are to report immediately to the campus. Upon arrival, each team member will restore their assigned buildings and inspect for any damages that may have occurred. All Team Leaders will be responsible for submitting a preliminary report on the damages and a final report within three days after the incident.
The Damage Assessment Teams will be composed of the five (5) Team Leaders. Each Team Leader will submit damage estimates to the Building Maintenance Superintendent as soon as possible. Damage Assessment Teams will also include the University’s Satellite locations in their assessments.
|
“Building Assignments” |
“Teams” |
“Team Leader & Personnel” |
“Emergency Contact Numbers/Alternates” |
|
Administration Building
L.G. Building
Fine Arts
(All) Air Conditioner Units |
Team – 1 |
Joseph Fernandez (Leader)
Franklin Blas (Alternate 2)
Carmencita Oquindo
John Blas (Tugon)
Pedro Benito (Alternate 1)
Bertha Meno
Reynaldo Salas
Joseph Quenga
Derek Blas |
Contact Numbers are controled per privatcy act |
|
CLASS / HSS Building
Lecture Hall
EC Building
Marine Lab
WERI
Generator Houses |
Team – 2
|
Joaquin Ninete (Leader)
Michael Taijeron (Alternate 1)
Zina Pinaula
Leo De Guzman (Alternate 2)
Archilles Ponce
Cresencia Carreon
Evelyn Siquig
Gus Meno |
|
|
CNAS Building
Science
Health Science
Warehouse “A” & “B”
Dean Circle (ALL) |
Team – 3
|
Jesse Lujan (Leader)
Edwin Villagomez (Alternate 1)
Josefina Angeles
Rosemargaret B. Claros
Catalina Pineda
Sibal Basilio (Alternate 2)
Carmen Pinaula
Alan Villagomez |
|
|
ELI Bldg.
Computer Center/ MARC / PIP
R.F.K. Library
Trash Containers (ALL) |
Team – 4
|
George Mendiola (Leader)
Miranda Oderiong
Crisanto Oquindo
Kenneth Mendiola (Alternate 2)
Cesar Pakingan
Juan Quichocho
Carmelino Medina (Alternate 1)
Matthew Auayan
Steve Perdido |
|
|
SOE (School of Education)
Student Center
Dorm – 1, 2 & 3
Maintenance Shop |
Team – 5
|
Amado Guzman (Leader)
Adelaida Canlas
William Payumo (Alternate 2)
Ricardo Ponce
Jesse Reyes (Alternate 1)
Jose Mercado
Edgar Santos
Fidel Francisco
Francisco Cruz |
|
Note: Fieldhouse has their maintenance workers who can handle securing the Fieldhouse.
1. Fine Arts have AC unit obstructing shutters preventing full security.
Emergency Procedures: Shooting / Sniper / Campus Safety & Security
Emergency Telephone Numbers
- Call 911 (9-911), then
- Notify Campus Security at 735-2365 or 888-2456 or 720-2096 (pager), then
- Notify Safety Office at 735-2364/66 or 720- 4452, then
- Notify Building Maintenance Superintendent at 735-2376 or 476-8769 (pager)
Emergency Procedures: Shooting / Sniper / Violent Armed Individual
Types of Shooting Incident/Situation
The type of shooting incident/situation will determine the appropriate response.
If you are outdoors, immediately seek cover and move away from the line of fire.
If you are indoors, immediately gets down, move away from all windows and if possible, block or secure the room door to prevent the suspect(s) from entering.
Do not evacuate rooms or the building until instructed to do so by Campus Security, the Safety Office, or Building Maintenance Superintendent or a Guam Police Officer or unless it is absolutely clear that it is safe to do so.
Special precautions must be taken to ensure that persons who have impaired hearing are notified and persons with disabilities are assisted as appropriate (see attachment A).
Call 911 (9-911) from a college telephone. Do not hang up on the dispatcher until instructed to do so. The following information should be provided:
1. Indicate that there has been a shooting or that someone has been shot
2. The exact location of the suspect(s) including the building number (if applicable), floor number (if applicable), room number (if applicable), nearest landmarks (bookstore, cafeteria, etc.)
3. Whether you actually heard or saw any shots fired, if the suspect(s) is/are still shooting, what type of weapon(s) does the suspect(s) have? Handgun, Rifle, Shotgun or Explosive Device(s)?
4. Description of suspect(s): race, clothing, direction of travel, vehicle(s)
5. Condition and number of hostage(s) and victim(s) injured or killed
6. Any information or demands supplied or made by suspect(s)?
Shooting Incident/Situation: Evacuate Only When Safe and Appropriate
Active Shooter:
Evacuation is Not Recommended as the suspect(s) is/are mobile and fluid and often seeks targets of opportunity
It is generally safer to seek cover if near the suspect(s) and then move away quickly and stealthily keeping cover between you and the suspect(s) in the opposite direction
Sniper/Barricaded Suspect(s)
Remain in place of shelter or safety until instructed to evacuate or leave
Follow instructions of police officer or building monitor
If shooting is in progress, keep a low profile and silhouette, always maintain cover, be silent, follow instructions
Violent Armed Individual
During incidents or situations where a subject is armed with a deadly weapon other than a firearm or suspected explosive device, such as a knife, ax, or club, and is threatening or attacking others, the following actions should be taken:
The type of incident/situation will determine the appropriate response.
If you are outdoors, immediately move away from the suspect(s) and seek assistance.
If you are indoors, immediately move away from suspect(s) and if possible, block or secure the room door to prevent the suspect(s) from entering.
Do not evacuate rooms or the building until instructed to do so by Campus Security, the Safety Office, or Building Maintenance Superintendent or a Guam Police Officer or unless it is absolutely clear that it is safe to do so.
Special precautions must be taken to ensure that persons who have impaired hearing are notified and persons with disabilities are assisted as appropriate (see attachment A).
Call 911 (9-911) from a college telephone. Do not hang up on the dispatcher until instructed to do so. The following information should be provided:
1. Indicate that there has been an incident involving a weapon and someone has been or may be injured.
2. The exact location of the suspect(s) including the building number (if applicable), floor number (if applicable), room number (if applicable), nearest landmarks (bookstore, cafeteria, etc.)
3. Whether you actually heard or saw anyone threatening or injuring someone, if the suspect(s) is/are still threatening or injuring anyone, what type of weapon(s) does the suspect(s) have? Knife, Axe, Club or other type of weapon?
4. Description of suspect(s): race, clothing, direction of travel, vehicle(s)
5. Condition and number of hostage(s) and victim(s) injured or killed
Any information or demands supplied or made by suspect(s)
Attachment A
Assisting People with Disabilities during Emergencies
Always ASK someone with a disability how you can help BEFORE attempting to provide assistance. Ask how he or she can best be assisted and whether they are any special considerations or items that need to come with that person.
Blindness or Visual Impairment
Give verbal instructions to advise about the safest route or direction using compass directions, estimated distances, and directional terms (such as left, right, up, down).
DO NOT grasp a visually impaired person's arm - ASK if he or she would like to hold onto your arm as you exit, especially if there is debris or a crowd.
Give other verbal instructions or information as necessary.
Deafness or Hearing Loss
Get the attention of a person with a hearing disability by touch and eye contact. Clearly state the problem. Gestures and pointing are helpful, but BE PREPARED TO WRITE a brief statement if the person does not seem to understand.
Offer visual instructions to advise of the safest route or direction by pointing toward exists or evacuation maps.
Mobility Impaired
It may be necessary to help clear the exit route of debris (if possible) so that the mobility impaired person can move to a safer area.
If people with mobility impairments cannot exit, they should move to a safer area, e.g.,
Most enclosed stairwells.
An office with a door shut which is a good distance from the hazard (and away from falling debris in the case of earthquake).
If people are in immediate danger and cannot be moved to a safer area to wait for assistance, it may be necessary to evacuate them using a carry technique or, if available, an evacuation chair.
Notify police or fire personnel immediately about any people remaining in the building and their locations.
Police or file personnel will decide whether people are safe where they are, and will evacuate them as necessary. The Fire Department may determine that it is safe to override the rule against using elevators.
Emergency Evacuation of People with Mobility Disabilities or Injured People
Evacuating a disabled or injured person yourself is the LAST resort. Consider your options and risks of injuring yourself and others in an evacuation attempt. DO NOT make an emergency situation worse.
Evacuation is difficult and uncomfortable for both the rescuers and people being assisted. Some people may have conditions that can be aggravated or triggered if they are moved incorrectly. Remember that environmental conditions (smoke, debris, loss of electricity) will complicate evacuation efforts. The following guidelines are general and may not apply in every circumstance:
Two or more trained volunteers, if available, should conduct the evacuation.
DO NOT evacuate disabled people in their wheelchairs - evacuate the person NOT the wheelchair. This is standard practice to ensure the safety of disabled people and volunteers. Wheelchairs will be evacuated later if possible.
Always ASK people with a disability how you can help BEFORE attempting any rescue technique or giving assistance. Ask how they can best be assisted or moved and if there are any special considerations or items that need to come with them.
Before attempting an evacuation, volunteers and the people being assisted should discuss how any lifting will be done and where they are going.
Proper lifting techniques (e.g., bending at the knees, keeping the back straight, holding the person close before lifting, and using leg muscles to lift) should be used to avoid injury to rescuers' backs